When Tearing off a Roof
- The ground is tarped off to protect the plants and shrubs around the property
- At the end of the day the ground is completely cleaned up
- Roof is put back in the dry either with felt paper or tarps every night until the job is complete
- A 20 square home takes 3 days to complete with tear off - weather permitting
Services
Our roofing service include;
- Old & New Roofs
- Tear Offs
- Windows
- Bartile Roofs
- Roofing Repairs
- Re-roofs
- New Roofing Construction
- Gutters
- Asphalt Roofs
- Metal Roofs
- Wood Shake Roofs
- Siding
10 Point Check List
As owners of J & N Roofing Maintenance LLC we work with our guys on the job. On completion of job we like to go over a 10 point check list to make sure that the job is installed properly.
- Make sure ice and water shield is installed on top of drip metal
- Make sure they have the proper hangover of 1/4 inch on rake eaves
- Make sure that nails are installed in nail line of shingles and not above
- That gauging is done at 5 ½
- That the shingle pattern is done to GAF manufacturer specifications
- Make sure all pipe flashing and vents are sealed off correctly
- Make sure all wall flashing and counter flashing is done correctly
- All gutters are cleaned out of any roofing material, leaves and dirt
- Make sure there is a hose connected to cooler and runs into gutter
- Make sure job is cleaned up of all nails and roofing material
Assurances
We ensure licensed and certified roofing contractors
- Licensed
- Certified
- Insured
- References Available
- Warranties
- Locally Owned
Payment Options
We offer several payment options to better assist our customers
- Cash
- Personal Checks
- Bank Checks
- Debit Cards
- Visa
- Mastercard
- Discover
- Insurance Accepted
Have A Question?
If you have any questions you may contact Norm at (801) 949-7845
Thank you for allowing us the opportunity to bid on your home.