Welcome to J & N Roofing Maintenance — (801) 969-5759
For All Your Roofing Maintenance Needs
-
The ground is tarped off to protect the plants and shrubs around the property
-
At the end of the day the ground is completely cleaned up
-
Roof is put back in the dry either with felt paper or tarps every night until the job is complete
-
A 20 square home takes 3 days to complete with tear off – weather permitting
-
Old & New Roofs
-
Tear Offs
-
Windows
-
Bartile Roofs
-
Roofing Repairs
-
Re-roofs
-
New Roofing Construction
-
Gutters
-
Asphalt Roofs
-
Metal Roofs
-
Wood Shake Roofs
-
Siding
As owners of J & N Roofing Maintenance LLC we work with our guys on the job. On completion of job we like to go over a 10 point check list to make sure that the job is installed properly.
-
Make sure ice and water shield is installed on top of drip metal
-
Make sure they have the proper hangover of 1/4 inch on rake eaves
-
Make sure that nails are installed in nail line of shingles and not above
-
That gauging is done at 5 ½
-
That the shingle pattern is done to GAF manufacturer specifications
-
Make sure all pipe flashing and vents are sealed off correctly
-
Make sure all wall flashing and counter flashing is done correctly
-
All gutters are cleaned out of any roofing material, leaves and dirt
-
Make sure there is a hose connected to cooler and runs into gutter
-
Make sure job is cleaned up of all nails and roofing material